The brand new Benson Taylor Public School entered its construction phase in mid-2013. The purpose of this project was to exchange the students from two older schools that were in the demolition phase. The new building will feature approximately 54,000 sq ft of space, consisting of 2 floors and a capacity of 530 students. Students from the 2 demolished schools started to attend Benson Taylor P.S. in September 2014. Additionally, the new facility will offer a variety of rooms from a science lab to a gymnasium for a versatile educational experience for the students. The building’s mechanical consultant is EXP Services Inc. and architect Glos Associates Inc.
HTS supplied all of the main HVAC equipment including:
• Daikin Applied Air Handling Units
• Aaon Condensing Units
• Sigma Convectors, Force Flows, Unit Heaters, Wallfin
• Daikin Wall Mounted Split AC Unit
• ABB Variable Frequency Drives