Concord Carlisle Beede Center, home to four pools and a fitness facility, needed an HVAC upgrade. The Beede Center’s existing units were failing due to poor materials used during construction, therefore becoming maintenance liability.
Selected as basis of design, HTS New England equipped the renovation with two Innovent Dehumidification Units to optimize energy efficiency and reduce operating costs for the facility. The new units will use outside air to control humidity levels, maintain a high indoor air quality, eliminate the concern of interior corrosion and reduce chloramine levels. HTS was able to provide the units to fit into existing mechanical spaces given the strict dimensional constraints.