Lakeridge Health Corporation approached HTS directly in the summer of 2008 with the challenge to replace 2 existing air handling systems in the “G” Wing.
GV-13 was a 48,000cfm make up air unit located in the G Wing penthouse. Equipment access for the penthouse was limited to the existing fresh air intake plenum (55″ wide). SF-65 was located in the basement of “G” wing only accessible through the hospital corridors. Both units were required to removed and re-installed and fully operation in 1 week.HTS put together the construction team of consisting of Durham Energy Specialists (Engineering) and Mutual Mechanical (Installation). With the help Haakon and McQuay and our construction partners we were able to build and execute the removal and replacement of these two systems in the allotted time.
HTS provided the equipment for the project including:
• Haakon – Custom AirPak Air Handling Unit (GV-13)
• DriSteem Steam to Steam Humidifier
• McQuay Air Handling Unit (SF-65)
• Cook exhaust fans
• Xylem/B&G Pumps
• ABB VFD’s