HTS New York provided the Public School 35 renovation with an updated air conditioning solution. With 639 students in attendance, P.S. 35 needed a HVAC system quiet enough to not be a disturbance. To meet the needs, HTS equipped the renovation with 2 Innovent Air Handling Units and 1 Innovent Dedicated Outside Air Unit. The units will ensure the 5-story school building is well air conditioned, while also being cost-effective.
P.S. 35
- Owner New York School Construction Authority
- ArchitectGruzen Samton, LLP
- General ContractorCitnalta
- Mechanical ContractorGrand Mechanical
- MEP EngineerLoring