HTS New York equipped the Mid-Hudson Regional Hospital renovation with a custom HVAC system. As basis of design, HTS provided 3 Custom Haakon Air Handling Units to ensure a high quality air conditioning solution for the 6-story hospital. The custom units are flexible to the sensitive areas of the hospital they service and operate at reduced load conditions to keep the facility energy efficient.
Mid-Hudson Regional Hospital
- Owner Mid Hudson Regional Hospital
- ArchitectFletcher Thompson
- Mechanical ContractorDP Wolff
- MEP EngineerCosentini