This project at the Gold LEED-certified facility entailed providing a 500-ton air-cooled chiller, which was the first AWS chiller commissioned in the U.S. The job was bid, awarded, submitted, and ordered all within a two-week time frame and carried a penalty of $10,000 per day liquidated damages if not completed on time.
San Antonio Port Authority ACS Call Center
- MEP EngineerCNG Engineers
- Mechanical ContractorVictoria A/C
- General ContractorSpawGlass