Hospitality & Retail Project

Toronto Marriott Markham

Downtown Markham is home to the elegant and luxurious Marriott hotel.

  • Marriott International Inc. Building Owner
  • Able Engineering Inc. MEP Engineer
  • The Remington Group Inc. General Contractor
  • Quadrangle Architects Limited Architect

Downtown Markham is home to the elegant and luxurious Marriott hotel. This modern hotel provides residents with an extravagant experience inside state-of-the-art suites and a multitude of services and amenities.

For this project, HTS used Haakon Make Up Air Units with wrap around heat pipes that gave the ability to provide tempered air to suite corridors. HTS also provided custom sheet metal solutions for the integration of fresh air into fan coils for the amenity conference spaces of the hotel.

HTS supplied the following equipment:

Cook SWSI Centrifugal Fans

Cook Mixed Flow Tubular Inline/Upblast Fans

Climetec 4 Pipe Vertical Fan Coil Units

Daikin Applied Custom Air Handling Units

Dectron Dry-O-Tron DS Pool Dehumidification Unit

Haakon Custom Air Handling Unit

HTS Engineering Control System

Kinetics Ceiling Spring Isolators

Kinetics Floating Floor

McQuay Destiny Air Handling Units

McQuay Horizontal Fan Coil Units

Ref Plus Air Cooled Condensing Unit

Sigma Bare Element

Sigma Unit Heaters

Sigma Wall Fin Element & Enclosure

Xylem Technoforce Variable Speed Pressure Booster

Xylem Bell & Gossett Suction Diffuser

Xylem Bell & Gossett Triple Duty Valves

Xylem Bell & Gossett Series 90 Pump

Xylem Circulators

Xylem Coalescing Removal Separator

Xylem Bell & Gossett Model GPX

Xylem Spacer Coupled Pumps with Pump Mounted Drives