The 2525 Bathurst Street project required a reliable, high-performance HVAC solution that delivers long-term efficiency and dependable comfort. The equipment selection was driven by the need for proven product reliability, strong technical support, and effective project management from design through installation. The chosen manufacturers were selected for their track record of performance and the assurance of accessible, knowledgeable service personnel throughout the project lifecycle.
HTS provided the following equipment:
- Sigma Unit Heaters
- Sigma Floor Fin Heaters
- Sigma Wallfin Heaters
- Daikin SWP Make-Up Air Units
- Omega Vertical Stack Heat Pumps
- Daikin Water Source Heat Pumps
- Pumps
- Hydronic Accessories
