Due to the vast urbanization in the city of Bradford more schools are required to satisfy the city’s population growth. Bradford Catholic E.S. is currently under development with an expected completion date of September 2015. The facility is expected to house approximately 470 students located in Bradford, which will belong to the Simcoe Muskoka CDSB. The newly constructed structure is expected to encompass a chapel, gym with a stage, and over a dozen classrooms within 48000 sq ft building. This school will provide students with a better place to learn and succeed. The Mechanical Consultant is DEI & Associates and the architect is Snyder & Associates.
HTS supplied all of the main HVAC equipment including:
• Daikin Applied Air Handling Units, Condensing Units, and Hot Water Coils
• Xylem B&G Boiler Pump, Circulation Systems
• Runtal Radiators
• Sterling Wall Fin, Convectors and Unit Heaters
• TWA Radiant Ceiling Panels