The task at hand was to create and fit custom Air Handling Units into the existing penthouse. The space was limited and fitting the units was a challenge our team overcame. We chose to go with 305,000 CFM Haakon custom AHUs to get the job done.
The task at hand was to create and fit custom Air Handling Units into the existing penthouse. The space was limited and fitting the units was a challenge our team overcame. We chose to go with 305,000 CFM Haakon custom AHUs to get the job done.