Emergency healthcare provider Excel ER recently opened a new 24-hour facility in Fort Worth, TX. As a medical facility, this project had a high demand for outside air and also required that the indoor units fit into the minimal space provided. HTS worked with mechanical engineer Bury to meet the building’s space constraints while providing temperature control in individual spaces throughout the facility.
HTS equipped the ER with 36 tons of Daikin VRV heat recovery and heat pump systems, a Danfoss Variable Frequency Drive, seven Dynamic V-8 filters, three Twin City Exhaust Fans, and 86 Krueger GRDs. A Neptronics duct heater and Neptronics humidifier finished out the system. By using Dynamic air filters in tandem with a VRV system, HTS was able to meet the demand for outside air in the building. A Daikin iTouch manager central controller was also installed to allow web-enabled control access.
Initially, the project ran behind the set schedule due to setbacks with manufactured equipment meeting specifications. HTS was able to ensure that the project deadlines were still met by utilizing expedited shipping options on all of the Airside Products.