HTS was presented with a new construction project for Ganado ISD that included two new buildings, one of which was two-stories. The goal was to incorporate a quiet and energy-efficient HVAC system that would save the facility money over the long term and incorporate a cost-effective system that would provide year-round dehumidification control for the facility. We accomplished that goal by installing 10 Daikin RTUs Both MPS & Rebels 3620 t0 13,450 CFM, two Daikin 2–Ton RK mini-splits, Distech controls system, two front ends, and systems per building. We also control the VRF system. HTS was chosen to be the basis of design on this project because of our efficiency, reliability, and trust.
Ganado ISD Campus Improvements
- ArchitectStantec Architect
- General ContractorDon Kruger Construction
- Mechanical ContractorAC Technical Services
- MEPAlderson & Associates