This project consisted of the addition of a two-storey 38,000 square foot structure above an existing building. The new space provides classrooms and study areas for the increasing number of students attending Humber College.
HTS Engineering supplied the following equipment for this project:
- Haakon custom air handling and rooftop units
- Sigma hydronic heating equipment
- Bell & Gossett pumps, heat exchangers, and accessories
- Loren Cook fans
- DuctSox air distribution systems
- Vibron silencers
- MetalAire air distribution accessories and variable air volume boxes