The Milton District Hospital added a four-storey patient care building and increased its size to 330,000 square ft of space. The hospital includes upgraded emergency and surgical services, increased overall capacity, increased capacity for Special Care Nursery and much more.
HTS provided Haakon units for design flexibility to meet space requirements and efficiency requirements. HTS was able to meet specific energy targets by using oversized air handling units with low air pressure drop.
HTS supplied the following equipment:
Cancoil Fluid Cooler
Cook Wall Propeller Exhaust Fan
Haakon Heat Recovery AHUs
RefPlus CRAC Units
Xylem GXP-P Plate & Frame Heat Exchanger