The Texas A&M Veterinary Medicine Administration Building needed a fan replacement for their air handling unit. The original single belt-driven fan went bad, and due to the age of the unit, the availability of repair parts was extremely limited. Texas A&M University trusted our HTS solution experts as the basis of design to incorporate a cost-effective and efficient fan wall into their existing unit. Our team was ready to deliver a workable solution to upgrade the equipment for a critical application in a very short timeframe.
This was an emergency replacement situation, and the simple solution to replace the old fac could have taken up to 10 weeks. To beat the clock, the team worked directly with the Q-Pac factory and selected two Q-Pac Fan Arrays due to their price, availability, and ease of install. This decision resulted in a 48-hour build from Q-Pac and next-day delivery from Florida to Texas, allowing the solution to be installed over the weekend. Our team acted quickly and went beyond expectations to provide a solution that not only got the job done but also upgraded the equipment to a quieter and more efficient unit that requires zero maintenance.
This team exhibited a true example of what it means to deliver real success.