This new emergency facility was looking for fast build times to start expanding patient care in the Sherman area as soon as possible. HTS was chosen as the basis of design to provide a cost-effective solution and excellent project management to ensure smooth delivery and installation. Six Daikin Rebel rooftop units were installed, whose inverter scroll compressors will give the facility unparalleled savings at a low noise level. Distech Controls tied the project together.
The Emergency Center of North Texas
- Owner Republic Health
- ArchitectYeatts
- General ContractorML Gray Partnership
- Mechanical ContractorDallas Mechanical Group
- MEP EngineerThe PDC Group