On the campus of the University of Texas at Austin, we assisted with the renovation of their Welch Hall. Using our existing relationship with the engineer, we provided an up-to-date system with energy recovery with 12 Haakon custom AHUs ranging from 5,000 CFM to 68,500 CFM and TCF fans. We were on a tight schedule due to working during off-hours when the students are not on campus. This renovation is scheduled to be completed by the end of 2019.
UT Welch Hall Renovation B
- Building OwnerUniversity of Texas at Austin
- ArchitectPayette Associates, Inc.
- General ContractorBeck
- Mechanical ContractorDSI
- MEP EngineerShah Smith & Associates