HTS Texas and Epsilon partnered up to design and build a complete cooling, cogeneration, data center solution in Dallas.
The customer’s needs included: 4.5 MW Gas Turbine Co-Gen Power Generation, a 3600-ton chiller plant (N+1) with absorption and centrifugal chillers, a hot water boiler plant, 2 MW (2N) data center, a high-performance integrated automation system, and 12kV power distribution for the campus.
The space for the cogeneration plant was extremely small and irregularly shaped, making the design and installation a challenge. HTS and Epsilon worked to provide the best in design, build, turnkey, MEP, and controls. With the combination of factory and field-built construction, all project goals were met, leaving the client with a high-quality, high-efficiency cogeneration plant.