HTS New England provided Concord Carlisle High School with a complete rooftop system of equipment. As basis of design, HTS equipped the new construction with 13 Valent Rooftop Units, 3 Innovent Rooftop Units, and 1 Epsilon Boiler Plant. Together, the system will ensure Concord Carlisle High School has an energy-efficient and cost effective HVAC system for the 1,300 students who attend.
The new school building includes a 600 seat auditorium, black box theater, two gyms, and a media wall consisting of 24 flat-screen televisions in the cafeteria – which lists water usage and air quality facts about the building in real time.