HTS was the basis of design to help expand Marriot Marquis’ Houston presence. Their downtown construction consisted of 29 floors and 1000 rooms, which required cost effective HVAC with custom features, sizing, and configurability.
Marriot’s needs were met with 26 Daikin Custom Air Handling Units, 12 ceiling mounted water source heat pumps and 66 Danfoss VFDs. The project was completed with a remarkable level of service to hit the tight Superbowl weekend deadline.